General frequently asked questions

Yes, most structural changes, additions, or major repairs require a building permit. Check with your local building authority.

Timelines vary based on the project’s size, weather, permit processing, and contractor availability. A full house build may take 6–12 months.

Renovation restores existing structures, while remodeling changes the design or layout entirely.

Look for licensed, insured contractors with references and a solid portfolio. Get multiple quotes and written contracts.

Building codes are regulations that ensure safety, structural integrity, and energy efficiency. Failing to follow them can result in fines or unsafe conditions.

Chemical waterproofing is the process of applying chemical-based products (like coatings, membranes, or sealants) to surfaces such as roofs, basements, walls, and concrete structures to prevent water infiltration.

It can be applied to a variety of areas including: Roofs and terraces Basements Bathrooms and toilets Water tanks Swimming pools Balconies External walls

Selection depends on: Area of application (e.g., roof, basement) Surface condition Exposure to sunlight or water pressure Budget